No | Nama Peserta | A | K | T | Penawaran | Penawaran Terkoreksi | Hasil Negosiasi | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | cv prima engineering - 02.230.125.3-612.000 | Rp. 196.651.064,85 | Rp. 196.651.064,85 | Rp. 196.209.200,00 | |||||||
2 | CV.PUTRA ALBARRA TEKNIK - 75.677.784.3-642.000 |
- A Evaluasi Administrasi
- K Evaluasi Kualifikasi
- T Evaluasi Teknis
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak